Skip to content

Moving guide

Moving guide

What sets the price, and what to prepare before the date.

Two weeks before

Book the survey

An early survey gives you a more accurate price and a better date.

10 days before

Decide what moves

What isn't moving doesn't need packing or transport. Sort early.

One week before

Prepare the layout

Mark where each room or department goes at the new site and share it with us.

3 days before

Arrange both sites

Inform management or security; check entrances, parking and lifts.

The day before

Disconnect appliances

Disconnect electrical equipment, empty fridges, keep key documents with you.

Moving day

Receive and check

Watch each piece go to its place and walk through with us before handover.

Practical guide

Moving checklist: what to prepare before moving day

This is a short, practical moving checklist for home owners and companies. It covers what to prepare before the survey, what to ask when you receive the quote, and how to get through moving day without surprises.

Before the survey

Write a rough list of rooms and large pieces, note the valuable or delicate items, and check the floor and lift at both sites. If the building needs a permit or a lift booking, ask the management early.

When you receive the quote

Make sure the quote lists the services included, such as dismantling, packing, moving, assembly and storage, the date of the move, and what is not included. The written quote is the reference on moving day, so read it carefully before approving.

Before moving day

Set aside what you will move yourself, such as important papers, jewellery and medicines; empty the fridge a day before; and tell us about any change of site or date. In companies, make sure the IT team is ready to disconnect and reconnect equipment.

Moving day and after

Be there, or name someone to follow loading and handover. After assembly, walk through the rooms and pieces with the team before signing for receipt, and note anything straight away.

Preparing rooms and pieces

Empty drawers of small items or gather them into boxes, mark the pieces that will not move, and note what you need on the first day in the new home. This makes packing and loading faster.

Building management

In towers and compounds, book the lift and request the permit at both sites, and ask about permitted loading hours. Send us this information before moving day.

A moving checklist for companies

Name a move coordinator, tell staff the schedule, and ask them to pack personal items in the numbered boxes. Make sure the archive is sorted before the move and the IT team is ready.

A suggested timeline

Weeks before: request a survey and review the quote. A week before: confirm the date and arrange permits. A day before: empty the fridge and pack a first-day bag. Moving day: follow the loading. After: walk through the rooms before signing.

The first-day bag

Pack a small bag with important papers, chargers, medicines, clothes for a day or two and basic kitchen items. It stays with you and does not go on the truck; it is one of the most useful items on any moving checklist.

Use this guide with your plan

This moving checklist supports the written quote; it does not replace it. When you are ready, request a survey and we will build the plan around what you actually need.

Survey and quote

Ready to move? Start with a survey.

Send the site, destination and type of contents. We schedule the survey, then send the written quote.

A survey does not commit you to anything. Price and schedule are written before any work.

Send the request and our team will contact you to schedule the survey.

Request a quote Plan your move

Prefer to write?

053 650 8507WhatsApp

Request a quote