Skip to content

Warehouses & factories

Warehouse and factory moves, to a written plan.

Racking, stock, equipment and office furniture. We inventory, number, take apart and move, then lay everything out to the plan of the new site.

Who it's for

  • You are moving a warehouse or part of your stock
  • You are moving a factory or a production line
  • You have racking to take down and reassemble
  • You need a written plan and a clear schedule
No obligation Price before you confirm 13 regions in Saudi Arabia

Request a quote

1The move 2Your details
Your choices 0
Your choices appear here as you pick them.

Your details are only used to contact you about your request.

What you get

01

Inventory before take-down

Racking and stock numbered before loading, so everything returns to its place.

02

Moves in phases

We split the move into phases where needed, so operations never fully stop.

03

Laid out to plan

Racking and stock at the new site exactly as you planned.

What we do

  • Site survey and move plan
  • Stock and racking inventory and numbering
  • Racking take-down and assembly
  • Loading and transport of stock and equipment
  • Layout to the new site plan

All services →

How we work

  1. Request

    Site, destination and type of contents, by form or WhatsApp.

  2. Survey

    A site visit, or a review of photos and the item list.

  3. Written quote

    Price, date and scope in one quote, before any commitment.

  4. Move and handover

    Take-down, packing, transport and assembly, then a walk-through with the client.

Why villa owners and companies choose Amouwaj

  • Survey before price, written quote before commitment
  • Take-down, packing, transport and assembly from one team
  • Packing matched to each piece, from marble to equipment
  • A walk-through with you at the new site before handover

Questions

Do you move heavy equipment?

Send the equipment details and weights with your request, and we will confirm in the survey what can be moved and how.

Can the move be done in phases?

Yes, we split the plan into phases where needed to reduce downtime.

Do you take down and reassemble racking?

Yes, numbered so it goes back in the same order or to the new layout.

Price and schedule are set after a site survey and inventory.

Service guide

Warehouse relocation in phases

Warehouse relocation and factory moves need more planning than any other move, because downtime means delayed orders and customers. We build a phased plan that sets what moves in each phase and how part of the operation keeps running during the move.

Surveying the warehouse or factory

We survey both sites: racking and shelving, stock and how it is classified, light equipment and machines, loading doors, ramps and the space available for trucks. Based on the survey we set the number of phases, the vehicles and the crew needed for the warehouse relocation, and put it all in the quote.

Classifying stock before the move

We work with your team on the stock list and number pallets and boxes by their location in the new warehouse. Stock does not arrive mixed up, and your team can start receiving and dispatching soon after the move.

Dismantling and rebuilding racking

We dismantle racking, shelving and other parts that come apart, number them, and rebuild them at the new site to the agreed layout. Heavy machines that need cranes or the manufacturer's technicians are stated clearly in the quote so there are no surprises on the day.

Moves between cities and regions

If the new warehouse is in another city, we plan the truck routes and arrival times and order the unloading by priority. We handle warehouse relocation within and between cities across all 13 regions of the Kingdom.

Keeping operations running

For warehouses that ship every day, we agree with you on stock that stays available for dispatch until the last phase, or we prepare the new site and receive part of the goods there before the old one closes. The aim is to keep orders moving with as little delay as possible.

Space, doors and truck access

We check loading doors, ramps, ceiling heights and forklift routes at both sites, and the hours trucks are allowed into the industrial area or city. These details set the number and order of trips in the warehouse relocation plan.

Handover and stock check

After each phase we hand over stock against the numbered list, and your team can check pallets and boxes at the new site before the next phase starts. This makes the stock count after the move faster and clearer.

How to start

Send a survey request with the form, including the type of business, both sites and the target date. We will book the survey and then send the warehouse relocation plan, price and schedule in writing.

Survey and quote

Ready to move? Start with a survey.

Send the site, destination and type of contents. We schedule the survey, then send the written quote.

A survey does not commit you to anything. Price and schedule are written before any work.

Send the request and our team will contact you to schedule the survey.

Request a quote Plan your move

Prefer to write?

053 650 8507WhatsApp

Request a quote